Flush Mount Pro Installation Guide

Aria Vent must be installed before flooring surface on the sub-floor level.

*This installation method is advanced. It can only be used for surfaces that are not installed.
    Materials:
    - Drill
    - Level
    - 10 screws
    - Pre cut piece of flooring material. *Cut before beginning installation

    - Bonding material (will vary for surface materials).
            Drop base piece on subfloor and fasten with screws.
            Dry fit body in base.
            Install surface material on top of base piece and butt up to the body.
            Adjust body up and down until flush with the top of surface material. Body should be flat to surface.
            Once adjusted to preferred height, use 4 screws to fasten body to base piece.
            Back-fill tray with bonding material and place pre cut piece of surface material inside tray.
            Hold in place. Flip tray upside down. Apply even pressure until surface material lies flat to the rim of tray.
            Leave bonding material to cure.
            Insert and slide tray in place.

            Contact us if you require additional assistance.